In most of these areas, copper plays a supporting role, making many of the savings possible. To accomplish it, GM integrated a number of critical features related to the use of energy, materials, water and the site itself. Copper's Role in Making It GreenĪchieving LEED Gold certification is no small feat. 4 It also allowed GM to identify every actual energy, material and water use need throughout the facility and to tailor systems to meet those needs. This process reduced the likelihood of design changes once construction was underway, which could have led to substantial time delays and additional costs. Using 3-D technology, design engineers built virtual models that allowed them to place assembly equipment throughout the plant and, then, to “walk” through it. 3 These are in addition to the stamping and paint shops which had been built previously on the site and were not included as part of the certification process. The approximately $800 million, 2 2.4-million-sq-ft facility includes a body shop, general assembly, administration and visitor’s reception buildings. GM’s Lansing Delta Township Plant was completed in 2006 Photo courtesy of General Motors
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |